View Categories

Fixed Projection Screens

9 Docs

1 Series Fixed

Last Updated: July 28, 2026

Frame Assembly (6 Steps) Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Material Installation (5 Steps) Step 1 Step 2 Step 3 Step 4 Step 5 Screen Mounting (2 Steps) Step 1 Step 2 Parts in the Box

Fixed Screens: Cleaning & Troubleshooting

Last Updated: July 28, 2026

General Cleaning Rules Never use abrasive pads or harsh chemicals on any screen material. Always test your cleaning method on a small, inconspicuous area first. "Soapy water" means diluted distilled water mixed with a small amount of mild dish detergent. Maestro White Vacuum with a soft bristle atta...

Fixed Screens: IP LED Kit Setup

Last Updated: July 28, 2026

LED Kit Setup Troubleshooting If LEDs are limited to white only and will not change color, manually cycle through the color modes using the physical button on the controller: Red → Green → Blue → White After selecting a color mode, power cycle the controller. Then refresh the Hue app. Connect to LED...

FlexGlass – Installation Instructions

Last Updated: July 28, 2026

X Series Fixed FlexGlass Installation - Quick Guide Projector Placement Mount your projector lens level with the top or bottom of the screen. Do not angle the projector or use keystone correction --this can distort image quality. Frame Assembly In a clean, open area, unpack and lay out all frame piec...

IR Backlight Remote – HEX Codes

Last Updated: July 28, 2026

Zero Edge/Fixed 2″: Legacy Snap Attachment – Installation Guide

Last Updated: July 28, 2026

Projector Placement Before beginning frame assembly, plan your projector placement. Mount the projector lens level with the top or bottom of the screen. Do NOT angle the projector or use keystone correction. Standard Frame Assembly (up to 120") Step 1: Prepare Your Workspace Clear a clean, flat area...

Zero Edge/Fixed 2″: Post Attachment – Custom Size – Installation Guide

Last Updated: July 28, 2026

Projector Placement Before beginning frame assembly, plan your projector placement. Mount the projector lens level with the top or bottom of the screen. Do NOT angle the projector or use keystone correction. Frame Assembly Step 1: Prepare Your Workspace Clear a clean, flat area large enough for the ...

Zero Edge/Fixed 2″: Post Attachment – In Stock – Installation Guide

Last Updated: July 28, 2026

Projector Placement Before beginning frame assembly, plan your projector placement. Mount the projector lens level with the top or bottom of the screen. Do NOT angle the projector or use keystone correction. Frame Assembly Step 1: Prepare Your Workspace Clear a clean, flat area large enough for the ...

Zero Edge/Fixed 2″: Retention Attachment – Installation Guide

Last Updated: July 28, 2026

FRAGILE -- BLACK DIAMOND FUSION material is delicate. Keep completely flat at all times. Avoid bending, folding, or sagging. Projector Placement Projector Placement Before beginning frame assembly, plan your projector placement. Mount the projector lens level with the top or bottom of the screen. Do ...

Go to Top